Find your industry ›
ICF Received order from Srilankan Railway to deliver 6 train sets of 13 Car each. There are 6 different types of cars for each type of train.
BFG Partnered in developing complete train interior toilet cabin etc for this project. First train was designed, manufactured and installed by BFG in record 9 months.
In all, 400 types of FRP panels were manufactured for complete train. To achieve aesthetic criteria set for the project, panel with multiple colour were produced and assembled.